Project Description

A stream traversing a large residential site had severely undermined banks due to increased water flows from upstream development. CGC Geoservices was contracted to install stabilization measures which included several fluvial geomorphic and bioengineering methods including cross vanes, weirs, log bumps, rootwads and live willow stakes.